In this lesson you will learn
- Explain what pilotage is and how it differs from navigating at the chart table
- Build a pilotage plan for a harbour entrance: legs, headings in °M, distances, times and what you expect to see
- Cover the dangers with clearing bearings and transits, and work out the depths to expect at your arrival time
- Set decision points, a way out, and back-ups for a missing or unidentified mark
- Run the plan on deck: share the jobs, tick off the marks and avoid the classic mistakes
Pilotage: navigating with your eyes up
So far in this module you have worked at the chart table: a course to steer that allows for the tidal stream, an allowance for leeway, and a fix every so often to check progress. Close to land that rhythm breaks down. In a harbour approach the dangers are close, a mark comes up every few minutes, and the decisions — is that the right buoy? turn now? — come faster than you could ever plot them. Navigating by eye in confined water like this is pilotage.
The secret of good pilotage is that the thinking is done before you arrive. At the chart table, in harbour or on passage while there is time, you prepare a pilotage plan: a short, simple description of the way in, leg by leg, with everything you will need to check. On deck you don’t plot at all. You look up, compare what you see with the plan, and tick things off.
Plan at the chart table. On deck: look, compare, tick off.
| Chart-table navigation | Pilotage | |
|---|---|---|
| Where you look | At the chart | Outside: marks, landmarks, the water |
| How you know your position | Fixes and EPs, plotted every half hour or hour | Marks ticked off, transits, clearing bearings and the depth sounder, moment by moment |
| Time per decision | Minutes to spare | Seconds to a minute or two |
| Directions | In °T on the chart, converted when needed | Worked out in advance in °M, ready for the compass |
| Distances | Miles | Cables (a tenth of a mile, about 185 m) and minutes |
The approach to Port Kerran
This lesson builds a complete plan for entering Port Kerran on the practice chart. Before reading on, look at the approach and find each of these:
- Kerran Approach buoy (LFl10s): a safe water mark with navigable water all round it, the usual start of the approach.
- No 1 (Fl G 5s) and No 2 (Fl R 5s): the first pair of lateral marks, 1.6 M north of it and 5.4 cables apart.
- No 3 (Fl(2) G 5s) and No 4 (Fl(2) R 5s): the inner pair, another 6.5 cables on, 4.9 cables apart.
- The leading lights (Oc 4s, front 6 m, rear 14 m), in line on 000°T straight up the middle of the channel and into the narrow inlet where the harbour lies.
- Mew Rock, which dries 1.2 m, marked by an isolated danger beacon (Fl(2)5s), 2.9 M north-west of the Approach buoy; and the wreck (4.2 m), 3.3 M west-south-west.
The direction of buoyage runs from seaward into the harbour, so going in you keep the green cones to starboard and the red cans to port (Lesson 16). The channel is deep — more than 20 m all the way to No 3 and No 4 — but beyond them the inlet shoals quickly through the 10 m, 5 m and 2 m contours to a drying head.
Building the plan, leg by leg
Break the way in into legs, each from one point you can recognise — a mark, or a pair of them — to the next. For each leg the plan gives:
- The heading, in °M for the steering and hand-bearing compasses, with the true figure beside it.
- The distance and the time it should take, so you know when the next mark is due.
- What you expect to see: the next marks, what they look like and where they will appear.
- The depth you expect, and the reading that would tell you something is wrong.
- Checks and decisions: clearing bearings, transits, and where you will stop and think.
Worked example
Leg 1: Kerran Approach buoy to No 1 and No 2
- 1The track runs up the leading line: 000°T.
- 2Variation for 2027 is 2°44'W, rounded to 3°W for chart work. Variation west, magnetic best: 000°T + 3° = 003°M.
- 3With the dividers, the Approach buoy to the line joining No 1 and No 2 is 1.6 M.
- 4At 5 kn: time = 60 × 1.6 ÷ 5 = 19 min (60D = ST).
- 5Expect No 1, a green cone (Fl G 5s), about 10° on the starboard bow, and No 2, a red can (Fl R 5s), about 10° on the port bow — from the Approach buoy they bear 010°T and 350°T, 10° either side of the line — with the leading lights in line ahead.
Leg 1: 003°M, 1.6 M, 19 min.
The other legs are worked the same way. At 5 kn the whole approach takes about 37 minutes:
| Leg | Heading | Distance · time | Expect to see |
|---|---|---|---|
| 1 · Kerran App → No 1/2 | 003°M (000°T) | 1.6 M · 19 min | No 1 to starboard, No 2 to port; leading lights in line |
| 2 · No 1/2 → No 3/4 | 003°M (000°T) | 6.5 cables · 8 min | No 3 and No 4, flashing twice; Mew Rock beacon abeam (273°M) after 2 cables |
| 3 · No 3/4 → harbour | 003°M (000°T) | 8.5 cables · 10 min | No more buoys; the inlet narrowing, leading lights close ahead |
| Way out | 183°M (180°T) | Back to Kerran App | Leading lights in line astern |
InteractiveStep through the plan
Pick each part of the plan to see its leg on the chart and its notes. Tick off each pair of marks as you would on deck.
Leg 1: Kerran Approach buoy → No 1 and No 2
003°M(000°T)1.6 M · 19 min at 5 kn
- Expect to see
- No 1 (green cone, Fl G 5s) about 10° on the starboard bow; No 2 (red can, Fl R 5s) about 10° on the port bow
- Leading lights (Oc 4s) in line ahead, rear above front
- Depth
- Over 20 m charted: sounder over 24.3 m
- Check
- Decision point here: marks and lights identified? If not, stay in the deep water round the buoy. Tick off No 1/2 at 1554.
Covering the dangers on the way in
The plan starts at the Approach buoy, but you have to get there. Arriving from the south, you may have to tack, and if you arrive on the ebb, diamond A shows the stream setting west-south-west — towards the wreck and Mew Rock. Rather than plotting fixes to check, give yourself a limit you can check by eye: a clearing bearing (Lesson 13) on the church spire, which you can see above the head of Kerran Bay.
Lesson 13 drew one for Mew Rock: spire NMT 033°T. But a clearing bearing guards only the danger it was drawn for, and far out that line passes only 1.8 cables from the wreck. This plan needs one line that clears both.
Worked example
A western limit that clears the wreck and Mew Rock
- 1From the wreck, the spire bears 031°T, 6.1 M away.
- 2To pass 4 cables clear at 6.1 M, swing the line about 4° (the 1 in 60 rule: 0.4 × 60 ÷ 6.1 ≈ 3.9°), rounding to the safe side: 027°T.
- 3Looking along the line at the spire, the wreck is on the left, so drifting towards it would make the bearing grow: the limit is NMT.
- 4Check Mew Rock: from it the spire bears 040°T, so the 027°T line passes 7.8 cables south-east of it too.
- 5Convert for the hand-bearing compass: 027°T + 3° = 030°M.
Western limit: church spire NMT 027°T (NMT 030°M) — 4.6 cables clear of the wreck and 7.8 cables clear of Mew Rock.
InteractiveSafe or not? Check a bearing of the spire
Enter a hand-bearing compass reading of the church spire (°M) and check it against the clearing bearing. Compare this plan’s bearing with Lesson 13’s, which was drawn for Mew Rock alone.
Clearing bearing: church spire NMT 027°T = NMT 030°M on the hand-bearing compass. Enter the spire’s bearing as you read it (°M).
Green: the safe side of the clearing line. Hatched red: the side it keeps you off. Dotted rings: 4 cables round the wreck and Mew Rock.
The tide at your arrival time
A pilotage plan is written for a time. Suppose you plan to reach the Approach buoy at 1535 BST on 4 June 2027. The Port Kerran table is in UT; adding an hour for BST gives LW 1025 BST 1.1 m and HW 1635 BST 4.5 m. You arrive an hour before high water, on a range of 3.4 m — between neaps and springs.
| Day | Time | m | HW/LW |
|---|---|---|---|
| Fri 4 Jun | 0315 | 4.6 | HW |
| 0925 | 1.1 | LW | |
| 1535 | 4.5 | HW | |
| 2145 | 1.2 | LW |
Worked example
What should the depth sounder read?
- 1At HW−1 the Port Kerran curve gives a factor of 0.95 for this range. Height of tide = 1.1 + 0.95 × 3.4 = 4.3 m (rising to about 4.5 m by the time you reach the harbour at 1612).
- 2Legs 1 and 2 stay in more than 20 m of charted depth; the 20 m contour crosses the line only 2.3 cables past No 3 and No 4. With the sounder set to show depth from the surface, expect more than 20 + 4.3 = 24.3 m.
- 3Leg 3 shoals: the 10 m contour crosses the line 7.4 cables past No 3 and No 4, and the harbour lies between the 10 m and 5 m contours, with the 5 m contour just 0.7 cables beyond. Make the 5 m contour your warning line: 5 + 4.3 = 9.3 m.
- 4Is there enough water? You need draught + margin = 1.8 + 0.5 = 2.3 m. The charted depth on the plan is more than 5 m all the way, so the height of tide needed is 2.3 − 5 = −2.7 m. A negative answer means none: you could follow the line at any state of tide.
Sounder: over 24.3 m until past No 3 and No 4. In the inlet, under 9.3 m means stop and check.
Off the line it is a different story. Over the inlet’s 2 m contour you would need 2.3 − 2 = 0.3 m of tide, and the head of the inlet dries. The plan keeps you on the line and ends off the harbour; beyond that, use the harbour’s own information from the almanac or pilot book.
The stream across the channel
Check the stream too. Diamond A, 1.9 M east of the approach, gives 070°T at HW−1: 1.2 kn at springs, 0.6 kn at neaps — about 0.9 kn for today’s range (Lesson 28). That sets you across the channel from west to east. To make good 000°T at 5 kn, the vector triangle of Lesson 29 gives a heading of about 350°T (353°M), making 5.2 kn over the ground.
Decision points and back-ups
Decide in advance where you will stop and think, and what you will do if something isn’t right. Port Kerran’s plan has three decision points and one way out.
- At the Approach buoy: go or no-go. Can you identify No 1 and No 2 and the leading lights? Is the visibility good enough to pick up each pair of buoys well before you reach it? If not, don’t start: the safe water mark has navigable water all round it, so stand off in the deep water there and sort it out.
- At No 1 and No 2: all as planned? Lights in line, the sounder over 24.3 m, the time about right. If anything disagrees, turn back.
- At No 3 and No 4: the last easy turn. Beyond them the inlet closes in towards the harbour, where the water deeper than 5 m is only about 2.7 cables wide, with shoal water and the drying head beyond. There is less room to turn, so commit only if all is well.
- The way out: 180°T (183°M) back down the line with the lights in line astern, to the deep water round the Approach buoy.
If a mark is missing
Buoys can drag, be damaged, or be moved or withdrawn (changes are published in notices to mariners), and a light can fail. Don’t go hunting for a missing buoy — but don’t simply assume it’s missing, either. Use the rest of the plan:
- The leading line gives your track.
- The depth confirms you are in the deep channel.
- The time tells you how far you have come.
- A check bearing tells you where you are along the line. Mew Rock beacon is due west of a point on the line 2 cables past No 1 and No 2: when it bears 273°M, you are there, with 4.5 cables to go to No 3 and No 4.
If you can’t identify the leading lights — a light can fail, and by day the structures can be hard to pick out against the land — the church spire stands almost on the line, bearing about 002°M from anywhere in the channel. That is a reasonable back-up for the track, as long as the buoys and the depth agree with it.
Writing the card and using it on deck
Keep the plan simple and big. A sketch on a card or a notebook page, in a waterproof sleeve, works better than a page of tables: draw the way in as a line of arrows from mark to mark, with the heading in large figures beside each leg, the distance and time, the marks with their characteristics, the clearing bearing with its NMT or NLT, the warning depth and the way out. Leave out anything you won’t need on deck.
Who does what
- The helmsman steers — keeping the leading lights in line — keeps a lookout ahead, and says so if anything looks wrong.
- The navigator holds the plan, picks out each mark early with binoculars, calls it before it arrives (“No 3 and No 4 fine on the bows, about six cables”), ticks it off with the time, takes check bearings and watches the depth sounder.
- Short-handed, brief the crew before you start, and keep the card where the helmsman can see it.
Ticking off
Every time you pass a mark, tick it off with the time, and compare the time with the plan: 1554 for No 1 and No 2, 1602 for No 3 and No 4. Before each leg, say out loud what comes next and where it should appear. Glance at the depth sounder whenever you tick something off. And use every transit the plan gives you — here the leading lights — because a transit shows your track without any compass error.
InteractiveWhat should you see next?
At each position, choose what the plan says you should see next. The view ahead appears once you have answered.
Position 1 of 4
Arriving from the south, a mile south of the Approach buoy, heading 003°M.
What should you see next, and where?
Common errors
| Error | What goes wrong | The defence |
|---|---|---|
| Misidentifying a mark | You take No 4 for No 2, or a mooring buoy for a channel mark, and turn early or pass on the wrong side. | Check colour, shape, topmark, number and light against the plan. Does its bearing, and the depth, agree? |
| Buoy hopping | Steering from buoy to buoy without checking the track between them; the stream sets you sideways onto the shoals. | Stay on the leading line or transit; know the track between marks, not just the marks. |
| Losing count | You expect the harbour when there is another pair to come, or turn at the wrong pair. | Tick off each mark with the time. |
| Heads down | Going below to plot in the middle of the channel, while no one watches the marks. | Do the work before you arrive. If you must check something, hand over the lookout first. |
| Forgetting the tide | An unexpected set across the channel; depths that don’t match because the height of tide was not allowed for. | Work out the stream and the sounder readings for your arrival time. |
A good pilotage plan is short and readable: headings in °M, distances and times, what you will see, clearing bearings, depths for your arrival time, decision points and a way out.
Variation is the course figure for 2027, 2°44'W, rounded to 3°W. Distances are along the leading line (total 3.1 M from the Approach buoy to off the harbour). The Isle of Kerran is fictional: never use this plan or chart to navigate a real boat.
Key terms
- Pilotage
- Navigating by eye in confined water, using marks, transits, bearings and the depth.
- Pilotage plan
- A short plan of the way in, prepared in advance and used on deck without plotting.
- Leg
- One part of the plan, from one recognisable mark or position to the next.
- Leading line
- A charted transit (often a pair of leading lights) marking a safe track, its bearing given in °T from seaward.
- Clearing bearing
- A bearing of a landmark, with NMT or NLT, that keeps you clear of a danger while you do not cross it.
- Check bearing
- A bearing (often of a mark abeam) that tells you how far along a leg you are.
- Decision point
- A place chosen in advance to confirm all is as planned before carrying on.
- Way out (abort)
- A planned route back to open water if anything does not match the plan.
- Warning depth
- A sounder reading, worked out for your arrival time, that tells you have strayed out of safe water.
- Buoy hopping
- Steering from buoy to buoy without checking the track between them.
- Ticking off
- Marking each mark on the plan, with the time, as you pass it.
Exercises
Check your understanding. You get a second try at each question, then the worked answer. Score 70% or more to complete the lesson — your progress is saved in this browser.
0 of 10 answered · 0 correct
Run the plan again
Five fresh questions on the Port Kerran plan: headings, clearing bearings, timings, depths and marks.