In this lesson you will learn
- Explain why one course for a passage of several hours can beat a new course every hour
- Work a multi-hour course to steer: estimate the time, lay each hour’s stream end to end, and swing an arc of hours × boat speed
- Choose the right diamond and row for each hour, and scale a part hour
- Interpret an arc that cuts short of or beyond the destination, and work out the passage time and ETA
- Plot the yacht’s expected hourly positions, check the dangers either side, and decide when to split a passage into legs
When one hour isn’t enough
In Lesson 29 you worked a course to steer from a one-hour vector triangle: one hour of stream from the start, one hour of boat speed from the end of it, and the water track between. That is all you need for a passage of about an hour, or a little more if the stream hardly changes. Over several hours it changes a lot. As Lesson 28 showed, the stream at each diamond builds, eases, goes slack and turns, hour by hour — and on a long leg the yacht moves from one diamond’s area into another’s.
There are two ways to deal with that:
- A new course every hour. Work a one-hour triangle for each hour in turn and change course on the hour. The yacht stays on the ground track all the way.
- One course for the whole passage. Allow for every hour’s stream at once, and steer a single course from start to finish. This is the Yachtmaster-level method, and the subject of this lesson.
Lay each hour’s stream end to end from the start, then swing an arc of the whole distance you will sail through the water. The water track to the cut is one course to steer for the entire passage.
Why steer one course?
- Cross-streams that reverse cancel. If the stream sets you one way for an hour and back the other way later, one course allows only for what is left over. Correcting every hour, you would aim up-tide against each in turn.
- A shorter distance through the water. Stemming a cross-stream costs speed along the track. A straight water track is the shortest way through the water to the same place, so one course usually arrives a little sooner. The saving is small with weak streams and grows when strong ones run across your track first one way and then the other.
- Less work. One construction at the chart table instead of one every hour, and one course for the helm to hold.
| A new course every hour | One course for the passage | |
|---|---|---|
| Chart work | A one-hour triangle each hour | One construction before you leave |
| Over the ground | Stays on the ground track | Leaves the track and comes back to it |
| Through the water | Stems each hour’s cross-stream | Allows only for the total drift: usually shorter |
| Best when | Dangers lie close to the track | There is sea room either side of the track |
The method, step by step
- Ground track. Draw the line from the start to the destination, with two arrows, and measure its direction (°T) and length.
- Estimate the passage time — distance ÷ boat speed through the water — to the nearest half hour. This tells you how many hours of stream to allow for; any part hour at the end is then a half.
- Find the stream for each hour. Work out roughly where the yacht will be in each hour (at boat speed along the track) and use the diamond nearest there. Convert HW Port Kerran to BST and use the row for that hour; interpolate the rate by the day’s range, exactly as in Lesson 28. Leave on the half hour of a tidal hour — at HW−5½, say — and each hour of the passage falls on exactly one row. Otherwise use the row for the middle of each hour.
- Lay the streams end to end from the start, three arrows each: hour one from the start, hour two from the end of hour one, and so on. A part hour at the end scales that hour’s stream: half an hour of a 1.2 kn stream is 0.6 M.
- Swing the arc. Open the dividers to the distance you will sail through the water in the same time — hours × boat speed — and from the end of the last stream swing an arc to cut the ground track (extended if need be).
- The water track is your course to steer. Join the end of the last stream to the cut, with one arrow, and measure it: that is the course to steer (°T) for the whole passage. Start to cut is the distance made good in that time; divided by the hours, it is your average speed over the ground.
- Check where the arc cuts — at the destination, short of it, or beyond — and work out the passage time and ETA.
- Then leeway, variation and deviation, exactly as in Lessons 29 and 30.
Arc radius = hours of stream × boat speed
The streams and the yacht must cover the same time.
Worked example: Kerran Bay to west of Kerran Head
On Tue 1 Jun you plan to sail from WP1, 1.8 M south-south-west of Kerran Approach buoy, to WP2, 4.5 M west-north-west of Kerran Head light. The track runs between Mew Rock and the wreck and passes west of the West Ledge buoy. You will make 4.5 kn through the water and plan to leave at 0911 BST.
Worked example
Tue 1 Jun, 0911 BST: WP1 to WP2
- 1Ground track WP1 to WP2: 322°T, 11.2 M.
- 2Time: 11.2 ÷ 4.5 = 2.50 h: to the nearest half hour, allow 2½ hours of stream.
- 3HW Port Kerran is 1341 UT = 1441 BST (5.1 m). 0911 is HW−5½, so the hours of the passage use the rows for 5, 4 and 3 hours before HW. Range 5.1 − 0.4 = 4.7 m: springs. Fraction (4.7 − 2.4) ÷ 2.4 = 0.96.
- 4Hour 1, 0911–1011: nearest diamond A, “5 hours before HW”: 250°T, rate 0.2 + (0.5 − 0.2) × 0.96 = 0.49, about 0.5 kn.
- 5Hour 2, 1011–1111: now nearest C, “4 hours before HW”: 340°T, rate 0.1 + (0.3 − 0.1) × 0.96 = 0.29, about 0.3 kn — almost slack.
- 6The final half hour, 1111–1141: still C, “3 hours before HW”: the flood has begun, 065°T, rate 0.4 + (0.9 − 0.4) × 0.96 = 0.88, about 0.9 kn. For half an hour: 0.9 × ½ = 0.45 M.
- 7From WP1 lay off 250°T 0.5 M, then 340°T 0.3 M from its end, then 065°T 0.45 M from that. The streams finish 331°T 0.34 M from WP1: they have nearly cancelled.
- 8Open the dividers to 2½ × 4.5 = 11.3 M and swing an arc from the end of the last stream to cut the ground track.
- 9The water track measures 321°T, just 0.3° to port of the ground track (321.6°T, which rounds to 322°T): the streams have almost cancelled, so the one course is very close to the track itself.
- 10The arc cuts the track 11.6 M from WP1, 0.4 M beyond WP2: the streams help a little, so you arrive a few minutes inside 2½ hours. A gap that small isn’t worth reworking. Average speed over the ground 11.6 ÷ 2½ = 4.64 kn; time 60 × 11.2 ÷ 4.64 = 145 min: ETA about 1136 BST.
One course to steer 321°T (before leeway), ETA 1136
| Day | Time | m | HW/LW |
|---|---|---|---|
| Tue 1 Jun | 0122 | 5.2 | HW |
| 0732 | 0.4 | LW | |
| 1341 | 5.1 | HW | |
| 1950 | 0.5 | LW |
| Hours | A49°43.1'N 004°08.6'W | C49°46.4'N 004°20.4'W | ||||
|---|---|---|---|---|---|---|
| DirSpNp | DirSpNp | |||||
| 6 before | 2450.80.4 | 2501.40.7 | ||||
| 5 before | 2500.50.2 | 2550.90.4 | ||||
| 4 before | 3300.20.1 | 3400.30.1 | ||||
| 3 before | 0600.60.3 | 0650.90.4 | ||||
| 2 before | 0651.00.5 | 0701.70.8 | ||||
| 1 before | 0701.20.6 | 0752.11.0 | ||||
| HW | 0701.10.5 | 0752.01.0 | ||||
| 1 after | 0700.90.4 | 0751.60.8 | ||||
| 2 after | 0750.50.2 | 0801.00.5 | ||||
| 3 after | 1500.20.1 | 1600.30.1 | ||||
| 4 after | 2400.60.3 | 2451.00.5 | ||||
| 5 after | 2451.00.5 | 2501.80.9 | ||||
| 6 after | 2501.10.5 | 2552.01.0 | ||||
| Hour (BST) | DiamondDiamond, row | Stream | Drift |
|---|---|---|---|
| 10911–1011 | A5 before | 250°T0.5 kn | 0.5 M |
| 21011–1111 | C4 before | 340°T0.3 kn | 0.3 M |
| 31111–1141 | C3 before | 065°T0.9 kn | 0.9 × ½0.45 M |
| 2½ h end to end | 331°T 0.34 M | ||
Had you re-planned every hour instead, the three one-hour triangles would give 328°, 320°, 310°T — a different course each hour, each aiming up-tide into that hour’s stream — and the passage would take 2 h 26 min, against 2 h 25 min on one course. With weak streams near slack water the saving is small; the work saved is not.
InteractiveMulti-hour course-to-steer builder
Step through the construction for the worked passage, then change the day, the time (BST), the boat speed or the leg. Use − and + to allow more or less stream time and watch where the arc cuts. Tick the box to see where the yacht will really be each hour. Zoom in to check the streams near the start.
Step 6 of 6: Water track = one course to steer
Join the end of the last stream to the cut, one arrow. Its direction is the course to steer for the whole passage; start to cut is the distance made good.
| Hour (BST) | DiamondDiamond, row | Stream | Drift |
|---|---|---|---|
| 10911–1011 | A5 before | 250°T0.5 kn | 0.5 M |
| 21011–1111 | C4 before | 340°T0.3 kn | 0.3 M |
| 31111–1141 | C3 before | 065°T0.9 kn | 0.9 × ½0.45 M |
| 2½ h end to end | 331°T 0.34 M | ||
One course to steer
321°T
Within half a degree of the ground track (321.6°T): the cross-streams almost cancel.
Made good 11.6 M in 2½ h · average 4.6 kn
The arc cuts the track 0.4 M beyond WP2. A small gap: you will arrive a few minutes earlier than 2½ h (about 2 h 25 min), and the course would change by a degree or so. Not worth reworking.
Passage time 11.2 ÷ 4.6 kn = 2 h 25 min · ETA 1136 BST
To the helm, with no leeway: 321°T → 324°M → 328°C (variation 3°W, deviation 4°W)
Short of the destination, or beyond?
The arc shows how far along the ground track you get in the time you allowed. If it cuts at the destination, your estimate was right. If it cuts short, the streams have held you back overall: the passage will take longer, and the stream in that extra time is missing from your plan. Add it — a part hour if need be — and swing a longer arc. If it cuts beyond, they have helped you along: you will arrive early, so take off the stream for time you won’t be at sea, and swing a shorter arc.
Leave the same waypoint at 1611 that afternoon (HW+1½) and the rows are 2, 3 and 4 hours after HW: 075°T 0.5 kn at A, then 160°T 0.3 kn at C, then 245°T 1.0 kn at C. With 2½ hours of stream the arc cuts 0.3 M short of WP2, because the stream is foul overall. The passage will take nearer 2 h 35 min; reworked for that time, the course changes only from 322°T to 323°T. A gap of a few tenths of a mile moves the course by a degree or so and isn’t worth reworking; a bigger one is.
The catch: off the line between the hours
One course is a straight line through the water. Over the ground the yacht goes wherever the streams so far have set her, and comes back to the ground track only at the end. Before you commit, plot where she will be at the end of each hour, as an estimated position (Lessons 14 and 30): from the last position, the water track for that hour (course to steer, boat speed × hours) and then that hour’s stream. Check those positions — and the lines between them — against the dangers on both sides.
On the morning passage the first hour’s stream sets the yacht towards the south-west, and the hours that follow bring her back. She is 0.5 M to port of the ground track at 1011 and 0.4 M to port at 1111, then back on it at WP2: on the open side. The wreck, 1.5 M from the ground track, is passed at 1.2 M, and Mew Rock at 1.3 M. That is fine.
In the afternoon the stream runs the other way. The first hour’s flood sets her north-east, and the streams that follow don’t bring her back until the end: 0.5 M to starboard of the track at 1711, 0.5 M to starboard at 1811. She would pass Mew Rock at 0.5 M and Head Ledge at 0.5 M, and pass within 0.1 M of the West Ledge buoy. The ground track itself was 0.6 M clear of that buoy.
That afternoon plan is not safe. 0.1 M off the buoy is no margin at all for errors in the stream, your speed and your steering, and the rocks the buoy guards lie just to the east of it. Don’t sail one course here: split the passage or leave at another time, as below.
When to split the passage into legs
Split a long passage into legs, each with its own course to steer, when:
- The expected track comes too close to a danger, as in the afternoon example. Put waypoints where the line must be held, or re-plan hour by hour past the danger.
- The route has to change direction — round a headland or a mark — so it is not one straight ground track anyway.
- You must be at a point at a particular time, such as a tidal gate off a headland, where you want the stream to turn in your favour.
- The passage is long and your estimates of speed and stream become less certain: re-plan from a fix part-way.
In the afternoon, re-planning every hour would mean courses of 316°, 323°, 334°T and a passage of 2 h 36 min — slightly slower than one course, but the yacht stays on the ground track, 0.6 M west of the West Ledge buoy. Leaving in the morning instead avoids the problem altogether.
InteractiveOne course or a new course every hour?
Compare the two ways for the same passage. Try the worked passage in the morning (0911) and the afternoon (1611), then a slower boat, or a spring tide in mid-flood on another leg. Watch the time saved, how far one course takes you off the line, and the closest danger.
| Measure | One course | New course every hour |
|---|---|---|
| Course to steer | 322°Tworked for the exact time, 2 h 25 min; worked with 2½ h of stream, as in the notes, it is 321°T | 328, 320, 310°T |
| Time to WP2 | 2 h 25 min | 2 h 26 min |
| Sailed through the water | 10.9 M | 11.0 M |
| Furthest off the line | 0.5 M to port | 0 (stays on it) |
| Closest danger or its mark | West Ledge buoy, 1.0 M | West Ledge buoy, 0.6 M |
One course saves 1 min here: the hourly courses stem each cross-stream separately; one course lets them cancel. To compare like with like, the one course here is worked for the exact passage time (as if you had reworked the estimate until the arc cut at WP2), so it can differ by a degree from the plan with the time rounded to the nearest half hour. A degree is finer than anyone can steer.
To the helm, and on passage
The construction gives a water track in °T. Turn it into a course for the helm exactly as before: leeway first, then variation (2°44'W in 2027, rounded to 3°W for chart work), then deviation from the card by ship’s head.
Worked example
321°T to the compass
- 1The wind is from 225°T, on the port side, and you expect 4° of leeway, pushing you to starboard. Steer up into the wind: 321 − 4 = 317°T.
- 2Variation 3°W: coming down the ladder, add it. 317 + 3 = 320°M.
- 3Deviation: near 320° the card is between 315° (4°W) and 000° (2°W), about 3.8°W, or 4°W. Westerly deviation is added too: 320 + 4 = 324°C. Check: the card at 324°C gives 4°W as well.
Steer 324°C from 0911; ETA WP2 about 1136 BST
On passage, keep the plotted hourly positions in front of you. A fix should fall near the expected position for that time, not on the ground track. If it is well away from it — because the stream, your speed or the leeway is not what you planned — work a new course to steer from the fix for the rest of the passage.
Estimate the time; lay each hour’s stream end to end from the start; swing hours × boat speed from the end; the water track is one course for the whole passage. Then plot where she will be each hour, and check both sides of the line.
Key terms
- Multi-hour course to steer
- One course for a passage of several hours, allowing for every hour’s tidal stream at once.
- Passage time estimate
- Distance ÷ boat speed through the water, to the nearest half hour: how many hours of stream to allow for.
- Streams end to end
- Each hour’s stream laid off from the end of the previous one, starting at the start: three arrows each.
- Part hour
- The last fraction of an hour of a passage: lay off that hour’s stream × the fraction.
- Total drift
- Where the streams alone would carry you in the whole passage: the end of the last stream vector.
- Arc radius
- Hours of stream × boat speed: the distance sailed through the water in the same time.
- Distance made good
- Start to arc cut along the ground track; divided by the hours, the average speed over the ground.
- Expected hourly positions
- Where the yacht will be at the end of each hour on one course: plotted to check for dangers.
- Splitting into legs
- Breaking a passage at waypoints, each leg with its own course to steer, to hold the line where it matters.
Exercises
Check your understanding. You get a second try at each question, then the worked answer. Score 70% or more to complete the lesson — your progress is saved in this browser.
| Hour (BST) | DiamondDiamond, row | Stream | Drift |
|---|---|---|---|
| 10722–0822 | C4 before | 340°T0.2 kn | 0.2 M |
| 20822–0922 | C3 before | 065°T0.6 kn | 0.6 M |
| 30922–0952 | A2 before | 065°T0.7 kn | 0.7 × ½0.35 M |
Plotting sheet: the ground track is drawn, extended beyond the destination. A starts on the start. Move B to the end of the first hour’s stream and pencil it in; the dividers then start from there for the next hour. After the last stream, swing the arc onto the track and pencil in the water track. The readout gives the distance and bearing A→B.
| Hour (BST) | DiamondDiamond, row | Stream | Drift |
|---|---|---|---|
| 10802–0902 | A4 before | 330°T0.2 kn | 0.2 M |
| 20902–1002 | C3 before | 065°T0.8 kn | 0.8 M |
| 31002–1032 | C2 before | 070°T1.4 kn | 1.4 × ½0.7 M |
| Head °CShip’s head °C | 000 | 045 | 090 | 135 | 180 | 225 | 270 | 315 |
|---|---|---|---|---|---|---|---|---|
| DevDeviation | 2°W | 1°E | 4°E | 5°E | 3°E | 0° | 3°W | 4°W |
Interpolate between entries for other headings. Variation in 2027: 2°44'W, rounded to 3°W for chart work.
0 of 10 answered · 0 correct
Multi-hour course to steer drill
Five fresh questions on real passages round the Isle of Kerran: one course to plot, a measurement or a rate from the tables, an ETA or arc radius, a course for the helm, and the method.